Jinan MT Machinery Co., Ltd.
Overseas buyers inspecting a fish feed extruder line with factory engineers on the workshop floor

Buyer Questions

Fish Feed Machine FAQ

Direct answers to what plant owners, formulators and buyers ask before ordering a floating or sinking fish feed line from Jinan MT Machinery.

Most Asked

Three Answers Buyers Want First

Jinan MT Machinery lets you test your own raw material at the factory, runs floating and sinking feed on one MT75 line, and delivers common standard models within 10 days.

Visiting feed mill owners watching a fish feed extruder trial in the factory 01

Can I test my own raw material at your factory?

Yes, you can visit and run your own recipe before you sign. Trials take place at our plant in Shandong, China, which has a dedicated complete-machine test workshop. You see the pellets first and decide afterwards.

Twin-screw fish feed extruder running on a production line in the workshop 02

Can one line make both floating and sinking feed?

Yes, one MT75 line runs both by changing the die and settings. You do not need a second line for bottom-feeder products. Die and screw configuration are built around your target pellets.

Fish feed machinery being packed into export wooden cases at the factory 03

How long does delivery take?

Common standard models are in stock and deliver within 10 days. Custom solutions take 30–50 working days. Your schedule is fixed at contract, so you can plan civil works and installation around it.

Will the line work with my local raw materials, such as corn, cassava or soybean meal?

Yes, and you can confirm it on your own blend before signing. Our R&D team works on extrusion technology, twin-screw configuration and die design, and matches them to local materials such as corn, cassava and soybean meal. Bring your materials to the factory and judge the expansion yourself.

"They tested our local cassava and rice bran blend at their factory before we signed, and the expansion ratio we got on site matched what they promised."

Pham Quoc Bao, Technical DirectorMekong Aqua Feed, Vietnam
Can you test my formula before I order?

Yes, formula testing is available at our factory. Share your recipe and target pellet, or run the trial in person with your own team. Formula, die and screw configuration can all be adjusted for your product.

How do you keep floating pellets stable in water?

Floating stability is matched to your recipe, then checked before the line leaves the factory. Formula, screw configuration and die are set for your product. Every line completes a full test run before shipment, so pellet performance is known before it reaches your site.

How do you prevent under-drying and mould in stored feed?

We size the dryer to your local humidity. Under-drying leads to mould in storage, and over-drying wastes energy, so the drying section is specified with your climate in mind. Drying, oil coating and cooling are designed as connected stages of the same line.

Should I buy a complete line or single machines?

We supply both, and a turnkey line is the surest way to get every section working together. A complete line covers grinding, mixing, conditioning, extrusion, die cutting, drying, oil coating, cooling and packing, built around the MT75 co-rotating twin-screw extruder with PLC/MCC control. Single machines suit plants adding to an existing line.

What can be customized on the line?

Output, die, screw configuration, heating method and formula can all be customized. That lets one project cover floating tilapia and catfish feed, sinking feed, shrimp and crab feed, or fry starter feed.

Do you offer OEM and ODM?

Yes, Jinan MT Machinery builds OEM and ODM equipment and works with 30+ OEM partners. Our own CNC machining, welding, assembly and painting lines keep production in one 20,000 m² base. Feed distributors and equipment traders get direct factory supply.

How do you prepare the workshop layout?

We draw a free process plan with CAD and 3D workshop layouts, and send an itemized technical quotation within 24 hours. The layout is based on your product, output, raw materials, local voltage and heat source, so each section connects to the next.

See Your Feed Run Before You Invest

Book a factory trial with your own raw material and leave with evidence for your investment decision.

Book a Raw Material Trial
  • 60+Export countries
  • 500+Global customers
  • 1,000+Production lines delivered
  • 20,000 m²Manufacturing base

For Procurement Teams

Purchasing and Logistics

Jinan MT Machinery accepts T/T and L/C, delivers stock models within 10 days and ships in export wooden cases with the full customs document set.

Extruder sections secured inside export wooden crates with protective wrapping
Which payment methods do you accept?

We accept T/T, L/C (usually at sight) and Alibaba Trade Assurance. D/P and D/A are considered only for long-term customers with good credit.

MethodUsed for
T/T, L/CEquipment orders, with L/C usually at sight
Trade AssuranceOrders placed through Alibaba
PayPalSmall orders
Western UnionSample orders
D/P, D/ALong-term customers with good credit
What is the lead time for stock and custom machines?

Common standard models deliver within 10 days from stock, and custom solutions take 30–50 working days. Production is scheduled once the contract is signed. Every line then completes a full test run before shipment.

How are the machines packed for export?

Machines ship in export wooden cases with rust and moisture protection. We also help you arrange export logistics.

Which documents ship with the goods?

Each shipment includes the CE certificate, packing list, invoice and customs documents. A third-party inspection report can be arranged as well.

For Technical and Procurement Teams

Certification and Materials

Meiteng fish feed machines are CE certified, built under ISO 9001:2015 quality management, and use food-grade stainless steel on material-contact parts.

Framed machinery compliance certificate on a white background
Framed quality management certificate on a white background
Company certification document displayed on a white background
Official factory certificate displayed on a white background
Are your fish feed machines CE certified?

Yes, our machines carry CE certification under Machinery Directive 2006/42/EC. The CE certificate ships with the goods for customs clearance.

Is your factory ISO 9001 certified?

Yes, we operate an ISO 9001:2015 quality management system. The workshop also runs 6S site management across production, assembly and testing.

Which parts use food-grade stainless steel?

All parts in contact with the material are food-grade stainless steel. This supports both feed safety and customs clearance requirements.

Can a third party inspect the line before shipment?

Yes, third-party inspection can be arranged before the line ships. It takes place around the complete line test run, and the inspection report is available for your records.

Will your engineers install the line and train my workers?

Yes, our engineers come to your plant for installation and commissioning, and they train your operators. Personnel training is also available as an ongoing service.

How long is the warranty?

The warranty is 12 months. Preventive maintenance, emergency repair and technical support are available to keep your line running.

How much do spare parts cost and how fast do they ship?

Spare parts are billed at cost and shipped with priority. As the manufacturer, we supply parts directly from our own factory.

"Spare parts arrived in eight days and were billed at cost, not with a three-times mark-up. That decided the second line for us."

Thiago Almeida, Maintenance ManagerAlmeida Piscicultura, Brazil
How long will spare parts remain available?

Spare parts supply continues for more than 10 years. Your line stays serviceable long after the warranty ends.

What support do I get after the warranty?

You get lifetime remote support by video, WhatsApp and email. Our team helps your operators diagnose problems directly with the people who built the line.

Still Have a Question

Ask Our Fish Feed Line Engineers

Send your question to Jinan MT Machinery and you will get a reply within 24 hours, covering your product, output, raw materials, voltage and heat source.

Overseas customers and factory team standing together after a project meeting